CORREN POSITION: HOME1 > NEWS CENTER > News

First Engineering Pile Driven for Ashuganj (East) 400MW Combined Cycle Gas Turbine Station Project

Source: Author: Date:2019-03-19【Font:B M S


On the morning of March 18, under the witness of the owner and the consulting company, the Ashuganj (East) Project by CNTIC drove the first engineering pile into earth. During the preparation of pile foundation, the project department, facing a range of difficult problems such as a short timeframe for preparing construction drawing, the long review process for consultation and drawing, and large differences between standards, concentrated its efforts on tackling the difficulties one by one, ensuring the timely start of pile foundation.
The first pile marked that the civil construction on the site would be carried out in an all-round way. The project department could carefully organize and make reasonable arrangements so as to complete the follow-up nodes on schedule.